Åsane Næringspark

Production - warehouse and office building

TB Poland has designed internal systems for a production - warehouse and office building located in Åsane district of Bergen, Norway. The building consists of three interconnected buildings: an office building with an underground garage, a production hall, and a storage room. All systems/installations have been designed in 3D, using AutoCad software with MagiCAD installation package. An IFC model of each installation has been created as well. Project architect’s supervision was provided and as-built documentation was prepared during the implementation. The facility has been executed.

RETURN TO PROJECTS TECHNICAL DETAILS
Location: Åsane, Bergen, Norway
Investor: MRC Solberg & Andersen AS
General Contractor: Hent AS
Architects: Eder Biesel Arkitekter
Area: 8 500 m²
Project period: November 2014 – November 2015
Project phase: Project finalized
Services:
1. Detailed Design Engineering (Design&Build):
- HVAC
- Heating and cooling
- Plumbing and piping
- Sprinklers systems
- Compressed air installation
- Electrical and weak current systems
2. Coordinated 3D model:
- BIM Level 2
- LOD 500
- Standard IFC2x3 cv 2.0 (MEP design)